High Point Elementary School Is Getting A Complete Makeover
The first phase of construction has already started on a new two story addition at High Point Elementary School. After hauling in tons of dirt, workers are now grading the grounds. Improvements to the school will take place over the next two years, and will happen in three separate phases. The first phase of construction includes renovations to the schools art room and gymnasium area. A new kitchen, cafeteria, and music room areas will be a part of the new addition. Phase one construction will also include the construction of a new courtyard area as well. The first phase is expected to be completed by the start of the 2018 school year.
Every single classroom will have four walls. This will eliminate the open-concept plan of the current building. Architects chose to modernize the school, instead of replacing it. That’s because an independent study shows that the schools grounds are not big enough to build a new school on the property without first demolishing it. The new two story addition is expected to be completed by the start of the 2018-219 school year.
Job Details
The General Contractor asked our team to use a spray foam insulting air barrier system to complete the job. Spray foam is designed to eliminate air leaks, reduce mold and moisture, and improve indoor air quality. Spray foam insulation is described as a high-performance insulation. It’s serves as an air barrier that offers several benefits to the customer. The advantages include Spray foam include, increased building strength, severe weather and flood resistance, and better indoor air quality.